

Suggested Yarn: | |
Finished Size: | 21"x80"blocked. Size can be modified by adjusting needle size. However, additional yarn may be needed. |
Yarn Requirements: | 1100 yards |
Gauge: | 24 sts and 36rows= 4 inches in stockinettestitchunblocked |
Needles: | 20stsand32rows=4inchesinstockinettestitchblocked |
Size 4 US (3.5mm) circular needle (24 inch) or size to obtain correct gauge Size 2 US (2.75 mm) double pointed needles | |
Size 12 (1.00 mm) Crochet Hook | |
Beads: | 808-SeedBeads;8/0MetallicGoldIris(8-462) |
Misc.Materials | 8 stitch markers |
Tapestry needle | |
k =knit | tbl=throughbackloop | yo=yarnover |
μnd = d | psso=passslipstitchover | k(p)2tog-knit(purl)2togetherasone |
m1=make 1 | PM=placemarker | st(s)= stitch(es) |
s1 = slip 1 | SSK=s1knitwise,s1knitwise,thenknit those 2 sts tog tbl |
Copyright @ 2011 Kathleen Cox. Pattern and garments made from pattern are for personal use only and not be used to produce items for resale.
Trade Winds - Shawl
Shawl Body
With larger needles, cast on 111 sts using a provisional cast on method. Beginning with Chart A (page 3) and work as follows: Work Rows 2 thru 10 Next, work Rows 14 thru 34 Next, work Rows 11 thru 34 Next, work Rows 11 thru 16 Next, work Rows 35 thru 44 Next: Work Chart B (page 5) as follows: Work Rows 1 thru 50 Next, work [ Rows 3 thru 50 ] 6 times Next, work Rows 3 thru 52 Next: Work Chart A (page 3) as follows: Work Rows 1 thru 10 Next, work Rows 14 thru 34 Next, work Rows 11 thru 34. Next, work Rows 11 thru 16 Next, work Rows 35 thru 44
Shawl Edging
Edging to be worked on smaller needles over the 111 stitches of the entire hem edge using Chart C (page 8) Notes: 1.At the end of each odd numbered row work the ssk using the remaining edge stitch along with the next shawl stitch waiting on the left-hand needle. One stitch from the shawl body will be used for every two edging rows worked. 2.In order to have 16 comlete repeats of the edging paten, you will need to pickup anadditional 2 stithes along the shawl body. These should be evenly distributed across the work. With WS facing, loosely cast on 13 sts using a knit-on method. Next: Work [Rows 1 thru 14] 16 times Next: Work Row 1 Bind off Remove the provisional cast on from the first halfof the shawl, placing 11 sts on the larger needle. With WS facing attach working yar and loosely cast on 13 sts using a knit-on method. Next: Work [Rows 1 thru 14] 16 times Next: Work Row 1. Bind off
Finishing
Weave in allose ends on WS of fabric. Soak shawl in lukewarm water with wool soap for approximately 60 minutes to completely saturate the fabric. Squeeze out excess moisture by rolling the piece in a towel. Stretch and pin the shawl to the finished measurements on page 1. Allow to dry completely before unpinning.Piece will relax slightly.
k =knit | tbl=throughbackloop | yo=yarn over |
μnd = d | psso=passslipstitchover | k(p)2tog-knit(purl)2togetherasone |
m1=make 1 | PM=placemarker | st(s)= stitch(es) |
s1 = slip 1 | SSK=s1knitwise,s1knitwise,thenknit those 2sts tog tbl |
Copyright @ 2011 Kathleen Cox. Pattern and garments made from pattern are for personal use only and not be used to produce items for resale.
Trade Winds - Shawl
Chart A


Copyright @ 2011 Kathleen Cox. Pattern and garments made from pattern are for personal use only and not be used to produce items for resale.
Chart A - Written Instructions
Notes: Directions for Inc 1 and Central Double Increase are located in the Chart A Legend (page 3). R1: RS - Knit across row to last st, wyif slip last st purlwise R2: Knit 6, p1, k across row to last 7 sts, p1, k5, wyif slip last st purlwise R3: Knit across rowtolast st, wyif sliplst st purise R4 Knit 6, p, kacross row to last7sts, p1, k5, wyif slip last st purlwise R5: Knit across row to last st, wyif slip last st purwise R6: Knit 6 sts, p1, pl then slip bead onto completed st, [p2, p1 then slip bead onto completed st] 32 times, p1, k5, wyif slip last st purlwise R7: Knit across ro to last st, wyif sliplast st purwise R8: Knit 6, p1, k across row to last 7 sts, p1, k5, wyif slip last st purlwise R9: Knit across row to last st, wyif slip last st purlwise R10: Knit 6, p1, k across row to last 7 sts, p1, k5, wyif slip last st purlwise R11: Knit7, ktog, [y, ktg,y yo, sy, stg-s]te; y, og,y, , y, ss twice, k, wyif sli last st p R12: Knit 6, p5,k5, p3, [p4, k5, p3]7 times; p2, k5, wyif slip last st puise R13: Knit 7, yo, [ktog, yo, p, yo, s, y]7 tmes; ktog, yo, p, yo, ssk, yo, ktog, 5, wyif slip last st puis R14: Knit 6, p4, k7, p2, [p3, k7, p2] 7 times; p2, k5, wyif slip last st purlwise R15: Knit 6, ssk,y,s,yys-s; ssk, y,,y - y,k,if slla st p R16: Knit 6, p4, k7, p2, [p3, k7, p2]7 times; p2, k5, wyif slip last st purlwise R17: Knit 7, yo,[s-ss,yo,, yo, k2tog,ytme; s2-2sso,yo, p,(y, tg)tice, k5, sliplast st pui R18: Knit 6, p4, 7, p2, [p3, k7, p2]7 times; p2, k5, wyif slip last st purlwie R19: Knit7,inc1,[y,ssk, yo,ptog, ptog, ptog yo, kog yo, cenral doule n]7te; y, ssk, y, ptog, ptg, ptog, yo, kt,y, inc 1, k6, wyif slip last st purlwise R20: Knit 6, p6, k3tog, p4, [p5,k3tog, 4]7times; p2, k5, wyif slip last st puise R21: Knit7, in 1, [, ssk twie, , (to,y) twice, cental doule in]ts; (, ssk) twice,p, (tg, yo twice, inc 1, k6,wi s last st purlwise R22: Knit 6, p7, k1, p5, [p6, k1, p5]7 times; p2, k5, wyif slip last st purlwise R23: Knit7,, [, yo, ss,y,s-t-, yo,ktg, y, pte; p,yo, sk y, kt-,y,ktg,y,p,k, wif slilt st purlwise R24: Knit 6, p1, k3, p7, k2, [k3, p7, k2] 7 times; k1, p1, k5, wyif slip last st purlwise R25: Knit 7, p, [, y, ssk, y, ktog, y p]7 tms p,yo, ss, y,k3tog, y, p, 6,wi slip last st pu R26: Knit 6, p1,k4, p5, k3, [k4,p, k]7times; k1, p1, k5,wyif slip last st purise R27: Knit7,,yyyy, ssy,i slla R28: Knit 6,p, k4, p,k3,[k4,p,k]7tme; ,p,k5,wif slilast st pur R29: Knit 7, p, [p3, yo,k2tog, yo, s2k-p2sso, yo, p]7tmes; p3, yo, k2tog, yo, 2--p2sso, p, k6, wyif slip last st purwie R30: Knit 6, p, k4, 5,k3,[k4,p5, k]7tmes; k1, p1, k5, wyif slip last st puri R31: Knit7, tg,[tg,ktog,yo, cetral ule inc, y, ssk, y,pt, pt]7te; ptg, y,ktg,y, cenral doule icre, yo, ssk, yo, (p2tog) twice, k6, wyif slip last st purlwise R32: Knit 6, p, ktog,p9, [ktog,p9j7tme; ktog,p, ,wif slplast st pui R33: Knit 7, p1, [(k2tog, yo) twice, central double inc,(yo, ssk) twice, p]7 times; (k2tog, yo) twice, central double inc, (yo, sk) twice, p1, k6, wyif slip last st purlwise R34: Knit 6, p1, k1, p11, [k1, p11]7 times; k1, p1, k5, wyif slip last st purlwise R35: Knit across row to last st, wyif slip last st purlwise R36: Knit 6, p1, k across row to last 7 sts, p1, k5, wyif slip last st purlwise R37: Knit across row to last st, wyif sliplast st purwise R38: Knit 6, p1, k across row to last 7 sts, p1, k5, wyif slip last st purlwise R39: Knit across row to last st, wyif slip last st purlwise R40: Knit 6, p1, pl then slip bead onto completed st, [p2, p1 then slip bead on completed st] 32 times, p1, k5, wyif slip last st purlwise R41: Knit across row tolast st, wyif sliplast st purwise R42: Knit 6, p1, kacross row to last7 sts, p1, k5, wyif slip last st purlwise R43: Knit across row to last st, wyif sliplast st purwise R44: Knit 6, p1, kacross row to last 7 sts, p1, k5, wyif slip last st purlwise
k = knit | tbl=throughbackloop | yo=yarn over |
μnd = d | psso=passslipstitchover | k(p)2tog-knit(purl)2togetherasone |
m1= make 1 | PM=placemarker | st(s)= stitch(es) |
s1 = slip 1 | SSK= s1knitwise,s1knitwise,thenknit those 2 sts tog tbl |
Copyright @ 2011 Kathleen Cox. Pattern and garments made from pattern are for personal use only and not be used to produce items for resale.
Trade Winds - Shawl
Chart B

Chart B - Written Instructions
Note: The total stitch count per repeat varies over the rows work. Please refer to the chart in the Chart B Legend for a summary (page 5).
R1: | Beginning on the RS, knit across row to last st, wyif slip last st purlwise |
R2: | Knit 6, p1; k2, p3, k2; pm, [p27; k2, p3, k2; pm] 3 times; p1, k5, wyif slip last st purlwise |
R3: | Knit 7, sm [p2, yo, s1-k2tog-psso then slip bead onto completed st, yo, p2; ssk, yo, s2-k1-p2sso, yo, k1-tbl, yo, ssk, k7, yo, k1-tbl, yo, |
R4: | Knit 6, p1; k2, p3, k2; sm, [p21; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise |
R5: | |
R6: | sliplast st purlwise Knit 6, p1; k2, p3, k2; sm, [p23; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise |
R7: | Knit 7, sm, [p2, k3, p2; k1, (yo, s2-k1-p2sso) twice, yo, k1-tbl, yo, ssk, k3, k2tog, yo, k1-tbl, yo, (s2-k1-p2sso, yo) twice, k1, sm] 3 times; p2, k3, p2; k6, wyif slip last st purlwise |
R8: R9: | Knit 6, p1; k2, p3, k2; sm, [p21; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise Knit 7, sm [p2, yo, sl-k2tog-psso then slip bead onto completed st, yo, p2; (k1, yo, k3, yo) twice, ssk, k1, k2tog, (yo, k3, yo, k1) twice, |
sm] 3 times; p2, yo, sl-k2tog-psso then slip bead onto completed st, yo, p2; k6, wyif slip last st purlwise | |
R10: R11: | Knit 6, p1; k2, p3, k2; sm, [p27; k2, p3, k2, sm] 3 times; p1, k5, wyif slip last st purlwise |
R12: | k2tog, sm] 3 times; p2, k1, yo, ssk, p2; k6, wyif slip last st purlwise Knit 6, p1; k2, p3, k2; sm, [p21; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise |
R13: | sliplaststpurlwise |
R14: R15: | Knit 6, p1; k2, p3, k2; sm, [ p25; k2, p3, k2; sm J3 times; p1, k5, wyif slip last st purlwise Knit 7, sm [p2, yo, sl-k2tog-psso then slip bead onto completed st, yo, p2; k1, (yo, s2-k1-p2sso) twice, yo, k2tog, k3, yo, k1, yo, k3, ssk, |
R16: R17: | Knit 6, p1; k2, p3, k2; sm, [p23; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise |
R18: | st purlwise Knit 6, p1; k2, p3, k2; sm, [p23; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise |
R19: | k6,wyifsliplaststpurlwise |
R20: R21: | Knit 6, p1; k2, p3, k2; sm, [p21; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise Knit 7, sm [p2, yo, sl-k2tog-psso then slip bead onto completed st, yo, p2; ssk, yo, k1, yo, k3, yo, ssk, k5, k2tog, yo, k3, yo, k1, yo, |
R22: | Knit 6, p1; k2, p3, k2; sm, [ p23; k2, p3, k2; sm ] 3 times; p1, k5, wyif slip last st purlwise |
R23: | 3 times; p2, k1, yo, ssk, p2; k6, wyif slip last st purlwise |
R24: R25: | Knit 6, p1; k2, p3, k2; sm, [ p21; k2, p3, k2; sm ] 3 times; p1, k5, wyif slip last st purlwise |
R26: | Knit 6, p1; k2, p3, k2; sm, [p27; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise |
R27: | - ' s 0 (o ' s 's ds s-- s ' |
laststpurlwise | |
R28: R29: | Knit 6, p1; k2, p3, k2; sm, [p21; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise |
ssk,p2; k6,wyif slip last st purlwise | |
R30: | Knit 6, p1; k2, p3, k2; sm, [p25; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise |
R31: | Knit 7, sm, [p2, k3, p2; k1, (yo, s2-k1-p2sso) twice, yo, k2tog, k3, yo, k1, yo, k3, ssk, (yo, s2-k1-p2sso) twice, yo, k1, sm] 3 times; p2, k3, |
p2;k6,wyif sliplast stpurlwise | |
R32: | |
Knit 6, p1; k2, p3, k2; sm, [p23; k2, p3, k2, sm] 3 times; p1, k5, wyif slip last st purlwise | |
R33: | |
Knit 7, sm [p2, yo, sl-k2tog-psso then slip bead onto completed st, yo, p2; k1, yo, k2, k2tog, yo, k2tog, k9, ssk, yo, ssk, k2, yo, k1, sm] 3 | |
k = knit | tbl=throughbackloop | yo=yarnover |
μnd = d | psso=passslipstitchover | k(p)2tog - knit(purl) 2 together as one |
m1=make 1 | PM=placemarker | st(s)= stitch(es) |
s1 = slip 1 | SSK= s1knitwise,s1knitwise,then knit those 2 sts tog tbl |
Copyright @ 2011 Kathleen Cox. Pattern and garments made from pattern are for personal use only and not be used to produce items for resale.
Trade Winds - Shawl
Chart B- Written Instructions Continued
R34: Knit 6, p1; k2,p3, k2; sm, [23; k2, p3, k2; sm] 3 times; p1,k5, wyif sliplast st puise R35: Knit 7, sm, [p2, k1, yo, sk, p2; ssk, yo, s2-k1-p2sso, yo, k1-tbl, yo, sk, k7, k2tog, yo, k1-tbl, yo, s2-k1-2sso, yo, k2tog, sm] 3 times; p2, k1, yo, ssk, p2; k6, wyif slip last st purlwise R36: Knit 6, p1; k2, p3, k2; sm, [p21; k2, p3, k2; sm 3 times; p1, k5, wyif slip last st purwise R37: Knit 7, sm, [p2, k3, p2; ssk, yo, k1, yo, k3, yo, ssk, k5, k2tog, yo, k3, yo, k1, yo, k2tog, sm] 3 times; p2, k3, p2; k6, wyif slip last st purlwise R38: Knit 6, p1; k2, p3, k2; sm, [p23; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise R39: Knit 7, sm [p2,yo, s-2tog-sso then slip bad onto comleted st, yo, p2; k1, (yo, s-psso) twice, yo, k-tbl, yo, ssk, k, ktog, yo, k1-tbl, yo, (s2-k1-p2sso, yo) twice, 1, sm] 3 times; p2, yo, s-k2tog-sso then slip bead onto completed st, yo, p2; k6, wyif slip last st purlwise R40: Knit 6, p1; k2, p3, k2; sm, [p21; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise R41: Knit 7, sm, [p2, k1, yo, ssk, p2; (k1, yo, k3, yo) twice, ssk, k1, k2tog, (yo, k3, yo, k1) twice, sm] 3 times; p2, k1, yo, ssk, p2; k6, wyif slip last st purlwise R42: Knit 6, p1; k2, p3, k2; sm [p27; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise R43: Knit 7, sm,[p2, k3, p2; ssk,(yo, s2-k1-p2sso)3 times, yo, k1-tbl, yo, s1-k2tog-sso, yo, k1-tb, yo, (s2-k1-2sso, yo) 3 times, k2tog, sm] 3 times; p2, k3, p2; k6, wyif slip last st purlwise R44: Knit 6, p1; k2, p3, k2; sm, [p21; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise R45: Knit 7, sm [p2, yo, sk2tog-psso then slip bead onto comleted st, yo, p2; ssk, yo, 1, yo,k2, k2tog, yo, k3, yo,k1, yo, k3, yo, ssk, k, yo, k1, yo, k2tog, sm] 3 times; p2, yo, sl-k2tog-psso then slip bead onto completed st, yo, p2; k6, wyif slip last st purlwise R46: Knit 6, p1; k2, p3, k2; sm, [p25; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise R47: Knit 7, sm, [p2, k1, yo, ssk, p2; k, (yo, s2-k1-p2sso) twice, yo, k2tog, k3, yo, k1, yo, k3, sk, (yo, s2-k1-p2sso) twice, yo, k1, sm] 3 times; p2, k1, yo, ssk, p2; k6, wyif slip last st purlwise R48: Knit 6, p1; k2, p3, k2; sm, [p23; k2, p3, k2; sm] 3 times; p1, k5, wyif slip last st purlwise R49: Knit7, ,[,, p;,y,k,k,y,kt,k, ssk, y, ssk,, y,, 3; ,, p;, wif sllast st pui R50: Knit 6, p1; k2, p3, k2; sm, [p23; k2, p3, k2, sm] 3 times; p1, k5, wyif slip last st purlwise R51: Knit 7, sm [p2, yo, sl-k2tog-pso then slip bead onto completed st, yo, p2; k27; sm] 3 times; p2, yo, sl-k2tog-psso then slip bead onto completed st, yo, p2; k6, wyif slip last st purlwise R52: Knit 6, p1; k2, p3, k2; sm, [p27; k2, p3, k2, sm] 3 times; p1, k5, wyif slip last st purlwise
Trade Winds - Shawl
Chart C


Chart C - Written Instructions
R1: Beginning with wrong side, k2, p9, k1, ssk using last st from edging and 1 stitch from shawl body R2: Sl, k1, k1 then slip bead onto completed st, k1, yo, k3, k1 then slip bead onto completed st, k1, yo, k2tog, yo, k2 R3: K2, p11, k1, ssk using last st from edging and 1 stitch from shawl body R4: Sl, k1, k1 then slip bead onto completed st, k2, s1-k2tog-psso, k1 then slip bead onto completed st, k1, (yo, k2tog) twice, k1 R5: K2, p9, k1, ssk using last st from edging and 1 stitch from shawl body R6: Sl, k1, k1 then slip bead onto completed st, k1, ssk, k1 then slip bead onto completed st, k1, (yo, k2tog) twice, k1 R7: K2, p8, k1, ssk using last st from edging and 1 stitch from shawl body R8: Sl, k1, k1 then slip bead onto completed st, ssk, k1 then slip bead onto completed st, k1, (yo, k2tog) twice, k1 R9: K2, p7, k1, ssk using last st from edging and 1 stitch from shawl body R10: Sl, k1, ssk, k1 then slip bead onto completed st, k1, (yo, k2tog) twice, 1 R11: K2, p6, k1, ssk using last st from edging and 1 stitch from shawl body R12: Sl, ssk, k1 then slip bead onto completed st, (k1, yo) twice, k2tog, yo, k2 R13: K2, p7, k1, ssk using last st from edging and 1 stitch from shawl body R14: Sl, k1, k1 then slip bead onto completed st, k1, yo, k1, k1 then slip bead onto completed st, k1, yo, k2tog, yo, k2