Virgule
by Bristol Ivy

SIZE Width: 13.25" Length: 58.5' US7/4.5mm ndl: 32" circular, or size needed to obtain gauge tapestry needle MAIERIALS Manos del Uruguay SILK BLEND (70% extrafine merino wool, 30% silk; approx. 50g/150 yds), 4 sk of MC, I sk each of CCl and CC2 Shown in MC: #300U Rust; CCl: #3044 Briar; CC2: #32 14 Oxygen GAUGE 22 sts and 30 rows = 4"' in Stockinette stitch. NOTES Circular needle is used to accommodate large number of sts and changes of direction in fabric. Do not join; work back and forth in rows.

SECTION C CHART

SECTION B CHART

All efforts were made to make this pattern error-free. For questions or support, please email info@fairmountfibers.com Fairmount Fibers Ltd. 2015 Not to be reproduced or re-knit for profit Stripe Sequence 3 Rows I-4: Work in CCI. Rows 5-44: Work in MC. Rows 45-48: Vork in CC2. Rows 49-56:Work in MC. Rows 57-58: Work in CC2. Rows 59-66:Vork in MC. Rows 67-70: Vork in CCI. Rows 7I -90: Work In MC. ABBREVIATIONS BO: bind off CO: cast on CC: contrast color k: knit k2tog: knit 2 stitches together m: marker MIL: insert left needle under horizontal strand between stitch just worked and next stitch from the front to the back, knit through the back loop MI R: insert left needle under horizontal strand between stitch just worked and next stitch from the back to the front, knit through the front loop MC: main color ndl(s): needle(s) RS: right side p: purl ssk: slip 2 stitches, I at a time, knitwise to the right needle Return stitches to the left needle in turned position then knit them together through the back loops st(s): stitch(es) WS: wrong side STITCH GUIDE Stripe Sequence / Rows I-4:Work in CCI. Rows 5-I4:Work in MC. Rows 15-I8:Work in CC2. Rows I9-20:Work in MC. Rows 21-22:Work in CC2. Rows 23-24:Work in MC. Cable Cast-on Method \*Insert right ndl between first 2 sts on left ndl, kl from this position, leave the first st on left ndl and slip new st onto left ndl; repeat from \* for desired number of sts. Stripe Sequence 2 Rows I -4: Work in CCI. Rows 5-24: Work in MC. Rows 25-28: Work in CC2. Rows 29-32:Work in MC. Rows 33-34:Work in CC2. Rows 35-38: Work in MC. INSTRUCTIONS SHAWL (Note: Read the following instructions carefully before beginning, the stripe sequences and shawl begin at the same time.) Stripe Sequence: Work Stripe Sequence I six times, work Stripe Sequence 2 two times, work Stripe Sequence 3 one time; AND AT THE SAME TIME, shape shawl as follows: Shawl With CCI, CO 3 sts. (This counts as Row I of Stripe Sequence I.) Set-Up Row (WS): P3.
Section A
Starting with Row 3 of Stripe Sequence I, work Rows I-21 of Section A Chart. [25 sts] At end of Row 21, turn so WS is facing, then use the cable method and working yarn to CO 13 sts. [38 sts] Next Row (WS): Purl to end, turn so RS is facing, then use the cable method and working yarn to CO 13 sts. [51 sts] \*Work Rows I-23 of Section B Chart, working bracketed repeat twice per row. [73 sts] At end of Row 23, turn so WS is facing, then use the cabled method and working yarn to CO 13 sts. [86 sts]\* Next Row (WS): Purl to end, turn so RS is facing, then use the cable method and working yarn to CO 13 sts. [99 sts] Repeat from \* to \* once more, working bracketed repeat 4 times per row. [134 sts] Next Row (WS): Purl to end.
Section C
Next Row (RS): \*\*BO I3 sts, then work Row I of Section C Chart, working bracketed repeat 4 times per row. [12 1 sts] Continue to work Rows 2-23 of Section C Chart, working bracketed repeat 4 times per row. At the end of Row 23, turn so WS is facing, then use the cable method and working yarn to CO 13 sts. [134 sts] Next Row (WS): Purl to end.\*\* Repeat from \*\* to \*\* 9 more times.
FINISHING
BO all sts knitwise loosely. Weave in all ends and block to measurements.
