Siena Design by SueBerg

Yarn recommendation: Laceweight yarn Needles: 3.75 mm (US 5) Begin of work: Cast on 94 sts. Knit 3 rows. My solution for a neat edge: slip first stitch purlwise, knit last stitch to the back loop. Repeat rows 1 - 15 until your shawl has reached the desired length. In WS rows, purl the yarnovers and work all stitches as they present themselves, i.e. knit the knits and purl the purls. Pattern starts with Row 1 from Chart A. Work from Chart 1 from begin to center, then work from Chart B from center to end. Sorry, I was unable to present it in a better way :-(
Legend:
+Selvedge stitch purl knit Oyarnover skp: slip, knit, pass slipped stitch over k2tog slip, k2tog, pass slipped stitch over

cable 4 to the left or C4F: transfer 4 sts to cable needle in front of work, k4, then k the 4 from the cable needle cable 4 to the right or C4B: transfer 4 sts to cable needle in back of work, k4, then k the 4 from the cable needle transfer 4 sts to cable needle in front of work, k3, then k the 4 from the cable needle transfer 3 sts to cable needle in back of work, k4, then k the 3 from the cable needle 4114--0N0N03111400000N00--414--+19-oddddddd--oNodoloddddNodo oldddNod--dddddddd--+15 -oddddddd--Nodo o dddNoNodonodddoNo--dddddddd--+13 Foooooooo--ooonononoNoNoNoooooooooo--oooooooo--+1n411114--001010100N0N0N0311140--411114--+?Foooooooo--NoooonoooNoNooonoooooNo--oooooooo--+5Foddddddd--dNodonoddddNodonondddNod--dddddddo--+ 3 1 +--414--000N0N0N0N0413000--4T14=+--dddddddd--oondNoNoNodddddddddoon--dddddddoH--ddddddpd--onpddddNodolonpddNoNodol--ddddddpd--oooooooo--ooooooooooononoNoNoNooo--oooooooo--414--041300404040N0N0N00--414H--oooooaoo--oodooooooo4ononoNoNoNooo--aoaooooot--oooooooo--oonoooNoNooonoooooNooono--oooooooo